Pinnacle Engineering Group

Pinnacle Engineering Group

Site Development Experts

MILWAUKEE OFFICE 20725 Watertown Rd.
Suite 100
Brookfield, WI 53186

262.754.8888

CHICAGO OFFICE 1051 E. Main Street
Suite 217
East Dundee, IL 60118

847.551.5300

KENOSHA OFFICE 9114 58th Place
Suite 300
Kenosha, WI 53144

262.764.7843

Menu

MENUMENU
  • Home
  • About Us
  • Services
    • Engineering
    • Construction
    • Water Resources
    • Surveying
    • Landscape Architecture
    • Unmanned Aerial Vehicle (Drone) Services
  • Portfolio
  • Careers
  • Contact
  • *Test Portfolio Page

    Multi-Modal Facility

    Multi-Modal Facility


    Central Illinois

    Residential, Multi-Family Apartment

    Multi-Modal Facility (Central Illinois)Multi-Modal Facility (Central Illinois) – PEG is pleased to announce significant completion of Phases V & VI of the Multi-Modal facility in central Illinois. PEG staff has provided Civil Infrastructure Design and Overall Construction Owner Representation to deliver the turn key infrastructure project(s) from its inception. With completion of the most recent Phases, the Multi-Modal facility will include storage for over 1,100 rail cars, 6 unit train Storage-In-Transit (S.I.T.) tracks, rail load/unload facility, and intermodal container transload/temporary storage yard. In addition to the new construction, PEG designed and delivered the rehabilitation of an existing 500 car rail yard.
    American Society of Anesthesiologists

    American Society of Anesthesiologists


    Schaumburg, IL

    Uncategorized

    American Society of AnesthesiologistsAmerican Society of Anesthesiologists – PEG is pleased to announce the start of construction for the new American Society of Anesthesiologists Headquarters Building. This innovative 3-story office building is located in Schaumburg, Illinois on approximately 6.6 acres. PEG provided site civil infrastructure design, permitting, and construction representation. One of the many advanced design features included natural bio-swales in the parking islands to promote water quality and infiltration. By utilizing this approach, the owner was able to reduce their storm sewer cost by 40%.

    Picture provided by Tilton Kelly + Bell, LLC (Design Architect) & Epstein (Architect of Record)

    Food Distribution Center

    Food Distribution Center


    Location, State

    Uncategorized

    Food Distribution CenterFood Distribution Center – PEG is pleased to announce the start of construction for the new $32MM regional Warehouse/Distribution Center for United Natural Foods Incorporated. PEG provided civil site infrastructure design for the 80-acre parcel improvements as part of a design/built project team for the development of the project. The project is seeking LEED certification and will include grey water reuse for irrigation and native vegetation.

    Picture provided by Zilber Property Group

    DuPage Airport Fire Station

    DuPage Airport Fire Station


    DuPage, IL

    Uncategorized

    DuPage Airport Fire StationDuPage Airport Fire Station – PEG is pleased to announce the start of construction for the new DuPage Airport Fire Station. PEG provided site civil infrastructure, permitting, and construction review. The new station will provide rescue assistance to the airport and surrounding community.
    ULINE Corporate Campus

    ULINE Corporate Campus


    Location, State

    Uncategorized

    ULINE Corporate CampusLocation: Pleasant Prairie, WI

    As a follow-up to the initial headquarters campus, PEG provided design and permitting to fill the remaining developable lands and expand into a nearby parcel. In total, the campus features two distribution centers providing over 2.3 million square feet of warehouse with over 150,000 square feet of office space, two prairie style office buildings providing over 400,000 square feet of office space, and a corporate conference center built into the shores of an adjacent water body. The entire campus features rolling topography and mature landscaping designed to associate the feel of a longstanding development. The campus features over three miles of walking trails that allow interaction with natural features such as wetlands, wooded canopy, and floodplain and also developed features such as stormwater basins, prairies, and perimeter berming designed to mimic natural landscapes.

    Goodwill

    Goodwill


    Various Locations

    Uncategorized

    GoodwillLocation: Various Illinois and Wisconsin Locations

    These projects included both 20,000 square foot new stores and several take overs of existing space on one to three acre sites. PEG participated through various delivery types including design build and plan specification. Typical project includes site layout, grading, utilities, paving, storm water and permitting for all site related activities.

    American Society of Anesthesiologists HQ

    American Society of Anesthesiologists HQ


    Schaumburg, IL

    Uncategorized

    American Society of Anesthesiologists HQLocation: Schaumburg, IL

    PEG provided site civil infrastructure design, permitting and construction representation for this innovative three-story headquarters building. ASA is an educational, research and scientific society with more than 50,000 members organized to raise and maintain the standards of the medical practice of anesthesiology and improve the care and safety of the patient.

    Amazon e-fulfillment Center

    Amazon e-fulfillment Center


    Kenosha, WI

    Uncategorized

    Amazon e-fulfillment CenterLocation: Kenosha, WI

    1.1M square foot Distribution Center with 500,000 square foot sortation facility and 160-acre business park located on the I-94 corridor. Project schedule was fast tracked and critical to meet seasonal client needs. Included substantial wetland and floodplain permitting, significant DOT roadway improvements and phased approvals and construction. Significant offsite runoff was safely routed through the site, as well as the project meeting stringent Des Plaines watershed stormwater goals.

    Mount Tosa

    Mount Tosa


    Wauwatosa, WI

    Uncategorized

    Mount TosaLocation: Wauwatosa, WI

    Two 50-unit apartment buildings in the new Mt. Tosa development. Included coordination with master plan and extension of both private and public roadways. Master planning included multiple site and building configurations and adapting to changing wetland regulations. Subsoils consisted of highly variable fills also affecting building and utility placement. Stormwater management utilized new ponds and integrated wetlands to provide a high level of protection for the remaining environmental features.

    Good Shepherd Lutheran Church

    Good Shepherd Lutheran Church


    Oconomowoc, WI

    Uncategorized

    Good Shepherd Lutheran ChurchLocation: Oconomowoc, WI

    Construction of new church and facilities. Included restructuring of original stormwater plan and maintenance agreement and coordination with master plan.

    WE Energies P4 Rail Facility

    WE Energies P4 Rail Facility


    Pleasant Prairie, WI

    Uncategorized

    Energies P4 Rail FacilityLocation: Pleasant Prairie, WI

    New rail car repair facility to service unit train operations. Site was challenged with multiple environmental constraints. Ladder track geometrics required state and federal wetland and floodplain impacts and permitting as well as storm water management.

    Meacham Point

    Meacham Point


    Schaumburg, IL

    Uncategorized

    Meacham PointLocation: Schaumburg, IL

    PEG provided site civil infrastructure design including underground stormwater detention and permitting for this mixed – use brownfield development. The site features a hotel, medical office building and well known cafes.

    North End III

    North End III


    Milwaukee, WI

    Uncategorized

    North End IIILocation: Milwaukee, WI

    PEG provided engineering services for this mixed use building with Fresh Thyme Market and 168 luxury apartments. Included a challenging tight urban site, connectivity to adjacent property, Riverwalk, underground stormwater chambers and impacted soil management.

    Sendik’s

    Sendik’s


    Hartland, WI

    Uncategorized

    Sendik’sLocation: Hartland, WI

    PEG provided engineering services on the renovation of the existing Harbrook Mall including parking lot reconfiguration and reconstruction, new utilities, and addition of rain gardens to promote water quality and infiltration.

    Lutheran Homes of Oconomowoc

    Lutheran Homes of Oconomowoc


    Oconomowoc, WI

    Uncategorized

    Lutheran Homes of OconomowocPEG provided engineering services to this project including an initial therapy wing addition and parking renovation with subsequent senior living units and amenities. Interaction with the Village of Lac La Belle was the key site design element.
    Addison Fire Stations No. 1 and No. 2

    Addison Fire Stations No. 1 and No. 2


    Addison, IL

    Uncategorized

    Addison Fire Stations No. 1 and No. 2Location: Addison, IL

    PEG worked with the community fire department on two existing building renovations. Challenges included entry geometry and grades including significant ramping and ADA accessibility.

    Home 2 Suites Hotel

    Home 2 Suites Hotel


    Schaumburg, IL

    Uncategorized

    Home 2 Suites HotelLocation: Schaumburg, IL

    This Hilton brand development featured a water quality device and underground storm water management facility. PEG provided site design and permitting.

    Woodside Ridge

    Woodside Ridge


    Sussex, WI

    Uncategorized

    Woodside RidgeLocation: Sussex, WI

    PEG consulted on the design of a 57 lot subdivision. Challenges included annexation to Village, extreme topography, rocky materials, and connections to existing roadways and sidewalks.

    Zilber Property Group

    Zilber Property Group


    Various Locations throughout IL & WI

    Uncategorized

    Zilber IndustrialLocation: Various throughout IL & WI

    PEG provided civil engineering, land survey, and natural resource services for numerous build-to-suit and speculative development projects in Illinois and Wisconsin. Overall, Pinnacle staff members have lead civil design efforts for over 25 projects with the Zilber Property Group organization for office and industrial usage.

    Bethany Home

    Bethany Home


    Waupaca, WI

    Uncategorized

    Bethany HomeLocation: Waupaca, WI

    Senior housing expansion project to existing campus including SNF and RCAC components. Challenges included older utility systems and providing protection to surrounding trout streams.

    MILWAUKEE OFFICE

    20725 Watertown Rd. | Suite 100, Brookfield, WI 53186

    262.754.8888
    [email protected]

    CHICAGO OFFICE

    1051 E. Main Street | Suite 217 East Dundee, IL 60118

    847.551.5300
    [email protected]



    © Copyright 2025 Pinnacle Engineering Group, LLC. All rights reserved.

    KENOSHA OFFICE

    9114 58th Place Suite 300 Kenosha, WI 53144

    262.764.7843
    [email protected]
    Copyright © 2025 Pinnacle Engineering Group. Powered by WordPress. Theme: Spacious by ThemeGrill.
    MENU
    • Home
    • About Us
    • Services
      • Engineering
      • Construction
      • Water Resources
      • Surveying
      • Landscape Architecture
      • Unmanned Aerial Vehicle (Drone) Services
    • Portfolio
    • Careers
    • Contact