Hartland, WI Uncategorized Location: Hartland, WI PEG provided engineering services on the renovation of the existing Harbrook Mall including parking lot reconfiguration and reconstruction, new utilities, and addition of rain gardens to promote water quality and infiltration.
North End III
Milwaukee, WI Uncategorized Location: Milwaukee, WI PEG provided engineering services for this mixed use building with Fresh Thyme Market and 168 luxury apartments. Included a challenging tight urban site, connectivity to adjacent property, Riverwalk, underground stormwater chambers and impacted soil
Meacham Point
Schaumburg, IL Uncategorized Location: Schaumburg, IL PEG provided site civil infrastructure design including underground stormwater detention and permitting for this mixed – use brownfield development. The site features a hotel, medical office building and well known cafes.
WE Energies P4 Rail Facility
Pleasant Prairie, WI Uncategorized Location: Pleasant Prairie, WI New rail car repair facility to service unit train operations. Site was challenged with multiple environmental constraints. Ladder track geometrics required state and federal wetland and floodplain impacts and permitting as well
Good Shepherd Lutheran Church
Oconomowoc, WI Uncategorized Location: Oconomowoc, WI Construction of new church and facilities. Included restructuring of original stormwater plan and maintenance agreement and coordination with master plan.
Mount Tosa
Wauwatosa, WI Uncategorized Location: Wauwatosa, WI Two 50-unit apartment buildings in the new Mt. Tosa development. Included coordination with master plan and extension of both private and public roadways. Master planning included multiple site and building configurations and adapting to
Amazon e-fulfillment Center
Kenosha, WI Uncategorized Location: Kenosha, WI 1.1M square foot Distribution Center with 500,000 square foot sortation facility and 160-acre business park located on the I-94 corridor. Project schedule was fast tracked and critical to meet seasonal client needs. Included substantial
American Society of Anesthesiologists HQ
Schaumburg, IL Uncategorized Location: Schaumburg, IL PEG provided site civil infrastructure design, permitting and construction representation for this innovative three-story headquarters building. ASA is an educational, research and scientific society with more than 50,000 members organized to raise and maintain
Goodwill
Various Locations Uncategorized Location: Various Illinois and Wisconsin Locations These projects included both 20,000 square foot new stores and several take overs of existing space on one to three acre sites. PEG participated through various delivery types including design build
ULINE Corporate Campus
Location, State Uncategorized Location: Pleasant Prairie, WI As a follow-up to the initial headquarters campus, PEG provided design and permitting to fill the remaining developable lands and expand into a nearby parcel. In total, the campus features two distribution centers